THIS IS NOT JUST DIMENSIONAL CONTROL…..

First Time Fit Engineering

Critical Path Achieved with Critical Interface First Time Fits

Warners has a long history of successful first time lift and fit dimensional control projects around the world.

  • Complex interfaces or basic PAU installation
  • Towers and major vessel fabrication checks and installation dimensional Control

Poor Fit Ups Cause Delays

Warner Surveys Critical Interface Surveying prevents poor fit ups and avoids project delays.

3D Laser Scanning & Modelling, Siberia

Warner Surveys carried out 3D laser scanning of two Liquid Furnaces and surrounding plant / structure in Irkutsk, Russia.

SmartPlant 3D

A geo-referenced and registered point cloud was produced and supplied to the designers for use in SmartPlant 3D.

Clash Detection

The data was used to aid the design of tie-ins and headers and to avoid the new furnaces potentially clashing with adjacent furnaces.

 

Contact David Hutson HERE or call +44 (0)118 930 3314 to discuss how we can assist your project.